Once the quotation has been accepted, arrangements are made for the Planning of the operation to proceed. The following points are taken into consideration prior to the operations commencement.
-
Site visit by our representative to enable the method of the erection / dismantling operation to be planned in precise detail and any site plans, layouts, schematic drawings finalised.
-
Access to site for both transport and assisting cranage.
-
Selection of Crane that will be required to assist in the erection/dismantling process.
-
Proximity hazards due to standing height of crane to be erected and crane assisting in the operation.
-
Ground conditions
-
Arrangements for any necessary road closures or local authority liaison.